Avatara Condominium Mae Phim
01 Juni 2011 Avatara Condo news Building A:
• ° Kitchen installation almost ready
• ° A/C installations ongoing
•
• ° Rectification works ongoing
• ° Lift to be tested and certified
• ° Filling swimming pool
• ° Rear road work to start
04 Januari 2011 Current constuction report Avatara Condominium, Mae Phim Beach.
• Building A:
• ° Tiling works on 2, 3, 4 and 5 floor almost complete.
• ° Tiling works on 6th floor ongoing.
• ° Door installation has started.
• ° Plastering works on 6th floor ongoing.
• ° Block works on 6th and 7th floor ongoing.
• ° Electrical and sanitary piping works follows the block works.
• Building B:
• ° Ground works completed.
• ° Pile cap foundation has started.
• ° Mobilization of more workers ..... >>>>>
|